Project Details
Installing 25 kilo Meter of Carbon Steel Pipes With 2200 MM Diameter That Responsible for Collection and Transfering of Sewage and agriculture drianage To the Main Treatment Plant
Project Info
Installing 800,000 m3 Infrastructure In Al Hamam City, New Delta
Project Location
Al Hamam City, Dabaa Corridor, EGYPT.
Project Type
General Construction
Owner
Ministry Of Water Resources and Irrigation,Egypt.
Client
Armed Forces Engineering Authority, Egypt